Under the growth strategy, the Company has elaborated and is realizing the Program of prospective development, aiming at the increase of volume of quality production, equal to foreign analogues. The Program is also directed at technical re-equipment and introduction of effective manufacturing equipment and stable profit earning for further development of the enterprise.
Six investment projects initially belonged to the Program of prospective development. Four of them have been achieved, namely: - «Car&Truck Tire Plant, main building. Curing Shop No.1. Installation of 64" curing presses» - «Creation of agro tire production at the Giant Tire Plant» - «Creation of all-steel radial tire production for mine trucks at the OTR Tire Plant» - «Car&Truck Tire Plant, main building. Modernization of Curing Shop No.2 to create production of new generation of car tires» .
The following projects are scheduled for 2010-2011: - «Technical re-equipment of car tire production line» - «Creation of 16.00R20 and 445/65R22,5 all-steel tire production. Installation of tire building complex».
Furthermore BELSHINA specialists study the possibility to realize the following prospective investment plans: - «Technical re-equipment of all-steel truck tire production at the Car&Truck Tire Plant», - «Technical re-equipment of Giant Tire Plant», - «Creation of production of all-steel radial tires 57"», - «Modernization of power complex of BELSHINA OTR Tire Plant production on the basis of power cogenerating systems», - «Mechanical Plant. Modernization of mold producing area», - «BELSHINA JSC. Creation of production to process rubber-containing waste». |